Unit production cost: formula and example
Unit cost is the full production cost allocated to one good unit. It is used for pricing, margin planning, and comparing SKUs/lines; it is important to separate full and variable cost.
What the Metric Measures
The cost of materials, labor, and manufacturing overhead required to produce one good unit. It reflects process efficiency and planning quality.
Calculation
- COGM = Beginning WIP + (Materials + Labor + Overhead) − Ending WIP
- Cost per unit (full) = COGM / Number of good units
- Cost per unit (variable) = (Variable costs) / Number of good units
- Allocate fixed overhead based on normal volume (hours/machine hours)
- Batch costs (setup/QA) / batch size → into unit cost
- Account for scrap/rework and yield loss
Calculation example
5,000 items were produced in a month. Materials cost 1,250,000, direct labour 400,000 and production overheads (energy, equipment depreciation, shop costs) 350,000. Unit cost = (1,250,000 + 400,000 + 350,000) / 5,000 = 400, of which materials are 62.5%.
Data Sources
ERP/1C (BOM, routings, cost estimates), MES/SCADA (times, downtime, FPY), CMMS (repairs), energy meters, labor timesheets, cost center rate reference lists, WMS.
Interpretation
- Cost↓ — productivity↑, yield↑, setup↓, less downtime/scrap, better procurement
- Cost↑ — underutilization, rising material/energy prices, scrap/rework, long changeovers
- Analyze together with margin, OEE, WIP, capacity utilization, OTIF
Useful Breakdowns
- SKUs / families; lines / shops; shifts / days
- Materials (A/B/C); energy sources
- Batches; equivalent units / standard hours
- Utilization scenarios: standard vs. actual
Dashboard Visualizations
- Waterfall of unit cost by component
- Pareto of materials and energy
- Unit cost trend by SKU/line
- Variances: material price/usage; labor rate/efficiency; overhead
- The relationship utilization → cost per unit
How to Set Targets
Set a target cost based on the price corridor and planned margin; update standards (BOM/norms/routings) regularly; establish a normal base for overhead allocation and a cost-down program (SMED, yield, energy efficiency).
Common Mistakes
- Mixing standard and actual cost
- Allocating overhead based on theoretical 24/7 capacity
- Unaccounted scrap/rework and batch costs
- Outdated BOMs/norms; double-counting of energy/repairs
- Different currencies/VAT; using planned output instead of good output
Questions for Discussion
- Which component will deliver the biggest cost-down effect — materials, labor, or energy?
- What would −30% setup per batch deliver?
- What yield ensures the target margin at current prices?
- What is the normal overhead allocation base for your lines?